Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.
Endurant Energy provided engineering, procurement, and construction for the all-electric hybrid heat pump system at Hines’ new commercial building extension at 555 Greenwich St.
The first all-electric building in Manhattan utilizes geothermal loops to deliver 40% of the building’s heating and cooling needs through rooftop-sited heat pumps. The remaining load utilizes air source heat pumps. The hybrid system utilizes real time data - ground and air temperature - to ensure that heat pump selection is aligned to maximize energy efficiency and minimize operating costs.
Three geothermal loops installed within 63 24-inch and 32-inch diameter piles
Reduces electric consumption by 40% compared to other class A office buildings
1.5 million gallons of water saved across 555 Greenwich St. and adjacent building
No schedule impact